- Location: Hazelmere, WA
- Client: EMRC
- Timeframe-For-Completion: 6 Months
- Contract Value: $1-2 Million
Installation of a four-kilometre High Voltage (HV) cable between Hazelmere and Perth Airport as part of EMRC’s Hazelmere Wood Waste to Energy Plant project, showcased Densford Civil’s ability to design and construct. The job included boring under the Great Eastern Highway Bypass, Brookfield Rail and the APA high pressure gas lines (all with the required permits of course) with no incidents, damages or complaints, much to the client’s satisfaction.